madialexis04 madialexis04
  • 06-10-2017
  • Mathematics
contestada

The total pay for 12 hours of work at a base rate of (p) per hour plus a temporary raise of $2.50 per hour. How would I write this ??

Respuesta :

20hcharette
20hcharette 20hcharette
  • 06-10-2017
12P+2.50 HOPE THIS HELPS
Answer Link

Otras preguntas

Hannah thinks of a whole number. Rounded to the nearest 10, her number is 350 Rounded to 1 significant figure, her number is 300. a) What is the smallest possib
Write me a one idea, two mediums essay or get me one
La'Darian spends at least 30 minutes, m, practicing the trumpet each day.
Identify and describe the agricultural techniques used by Egyptian farmers. How did these techniques affect heir economy?
Gail made 7/8 quart of lemonade. Her sister drank 1/4 quart of the lemonade. How much lemonade is left? Group of answer choices 2/8 quart 3/8 quart 4/8 quart 5/
Gloria is making a table cloth to cover her dining room table. She bought 6 3/4 yards of fabric. Her total cost was $27. What was the cost per yard?
In the given figure, find the angle measures given. Please help, i've been stuck for 2 hours.
15,246 In the number above, which digit has the greatest value? Explain.
1.Năng lực pháp luật dân sự là gì và bao gồm những nội dung gì? 2.Trường hợp nào thì một cá nhân sẽ đc coi là mất năng lực hành vi dân sự hoặc có thể khó khăn t
What did the chinese workers build for landowners, such as reuben kercheval or pj, in order to reclaim swampland in the delta for farming?.