hesterbeau16
hesterbeau16 hesterbeau16
  • 08-02-2017
  • Mathematics
contestada

Martin works 32 hours a week for $7.50 an hour. Calculate his straight time pay over a 4-week period.

Respuesta :

numbrain
numbrain numbrain
  • 08-02-2017
7.5•32=240    240•4=960. he makes $960 a week
Answer Link

Otras preguntas

I told Uncle john about my accident I’m looking for common nouns amd proper nouns
66. Mechanical Engineering A crossed belt connects a 10-centimeter pulley on an electric motor with a 20-centimeter pulley on a saw arbor (see figure). The elec
A formalist looks carefully, even painstakingly, at the author's word choices. True False
Organizing Ideas As you begin to organize your ideas, think about how you will fully support each point. Make sure that you explain each main point using facts,
En la siguiente tabla se presenta varios números en la primera columna; represéntalos en factores
Big Ideas: Explain your reasoning.
Did you guess the story’s ending in strawberry spring, or were you surprised?
A 50.0-kg child stands at the rim of a merry-go-round of radius 2.70 m, rotating with an angular speed of 3.95 rad/s. What minimum coefficient of static frictio
The Koppen Climate Classification System depends mainly on __________. A. rainfall B. native vegetation C. patterns of precipitation D. average daily temperatur
Future skills Ed and Sam share a £225 car repair bill. Ed pays and Sam pays. How much does each pay?