The detailed plan that shows the exact end items (i.e., finished products) to be produced in a specific time frame is known as what

Respuesta :

dmd459 dmd459
  • 11-02-2022

Answer:

Master Production Schedule (MPS)

Explanation:

Master production schedules are plans for individual products to be produced. The plans specify the time a specific product is produced, inventory needs, staffing needs, etc. A master production schedule or MPS will quantify raw materials, processes, and other resources needed to optimize production. (optessa.com)

Answer Link

Otras preguntas

5/8 divide by 1/4  simplest form
Some similarities between the southeast and northeast region of the United States
The addition of a catalyst in a chemical reaction (A) increases the concentration of products at equilibrium. (B) increases the fraction of reactant molecul
The Gilded Age can best be described as a period of (A) intense political activity by the presidents (B) political agitation by Western farmers (C) labor unrest
how do I solve this problem (5.21 x 10^-5)^2
what are the letters of ternary form?
. What is the slope of the line with the equation 2x + 3y + 6 = 0 ?
When do the sister chromatids line up at the equator of the cell? a. metaphase b. anaphase c. prophase d. telophase
imagine that the number 2 button on your calculator is damaged and cannot be used.use a flow chart to show 3 different ways in which you can calculate 24x12
Three workers sort 66 boxes in a day. One of the workers is three times more productive than the second worker and twice as productive as the third worker. How