A building company completes 42 homes every 2 months. At this rate, how many homes can the company complete in 6 months?

A:63
B:126
C:252
D:504

Respuesta :

auroramt13
auroramt13 auroramt13
  • 11-01-2017
B. Because 42 houses for every 2 months so 84 houses for every 4 months and then 126 houses for every 6 months
Answer Link
sydielimchong
sydielimchong sydielimchong
  • 11-01-2017
the answer is B. 126
Answer Link

Otras preguntas

What is the remainder when 17,463 ÷ 59?
When solid mercury(ii) nitrate is heated, it decomposes to form solid mercury(ii) oxide, gaseous nitrogen dioxide, and oxygen?
What technology is used to ensure that the logical block addressing on a solid state drive does not always address the same physical blocks, in order to distrib
What is the same person's mass on mars, where the acceleration due to gravity is 3.7 m/s2?
Help Please.. Factor the following as the sum of two cubes. 8000 + a^3
9,000g equals how many kg
Round 214.0822 to the nearest tenth.
What potential difference vwc between the wire and the cylinder produces an electric field of 2.00Ã104 volts per meter at a distance of 1.20 centimeters from th
Something that is arguable is
This type of muscle is generally attached at one or both ends to a bone by tendons.