drakester2004 drakester2004
  • 06-09-2021
  • Engineering
contestada

Deviations from the engineering drawing cannot be made without the approval of the
A. contractor
B. architect
C. engineer
.D. foreman

Respuesta :

manamoto13 manamoto13
  • 06-09-2021

Answer:

a. contractor

Explanation:

The contractor has to approve or give the sign for the drawings to be made, otherwise you can't do anything.

Answer Link
teddiarsa
teddiarsa teddiarsa
  • 06-09-2021

Answer:

it's option a. contractor

Explanation:

did the same quiz

Answer Link

Otras preguntas

Read the following excerpt from Heart of Darkness:Paths, paths everywhere; a stamped-in network of paths spreading over the empty land, through the tall grass,
What is the area of the trapezoid below? 30 POINTS!!!
Find the x-intercept and y-intercept from the following linear equation: -x+y=3​
Which of the following statements about Iraq’s people and culture is NOT true? Most Iraqis live in cities. Nearly all Iraqis are Muslims. Most Iraqis are Sunni
X/2=1.2 Solve for x and check.
Amoeba use _________ to move and ingest prey.
if construed in the sense they were intended, and carried out, inculcate that the Constitution of the United States is founded on Compact—that this Compact deri
Which phrases describe the atmosphere? Check all that apply. protects Earth’s surface contains a mixture of gases and particles includes organisms in the air, o
7 times the sum of a number and 4 is the same as 8 decreased by 3 times the number. Find the number
A which language style would be appropriate for the given situation ? conversation with friends at a backyard barbeque