katlynnchandler katlynnchandler
  • 08-07-2021
  • Mathematics
contestada

It takes 5 hr for 2 bricklayers to build a park wall. How long would it take 8 bricklayers to complete the job?

Respuesta :

tyrapipkin00 tyrapipkin00
  • 08-07-2021
1 hour and 25 mins
It takes 1 hour and 25 mins to complete the 8 bricklayers job
Answer Link

Otras preguntas

Since rock is hot, then __
Of a number is added to the numerator of 3/7 and twice that number is added to the denominator of 3/7, the resulting fraction is equivalent to 10/21. Find the n
What is the major landform of northern africa? A. Tropical rain forest B. Sahel C. Savanna D. Sahara
i need help on question 5 pls
Angel is a high school basketball player. In a particular game, he made some free throws (worth one point each) and some two point shots. Angel made a total of
A shoe store uses a 60% mark up for all the shoes that cells. What would be the selling price of a pair of shoes that has a wholesale cost of $53?
Who established the Negro Industrial League? Select the best answer from the choices provided. A. Robert W. Weaver and John P. Davis B. Robert W. Weaver and M
Based on the location on periodic table which best compares the properties of the metaloids arsenic and antimony
Completa las oraciones sobre las actividades que hacía cada persona de esta familia en un día de playa. Usa la forma correcta del verbo entre paréntesis. Despué
-5(m-4) it’s due today pls help me