balasupramaniyamraja
balasupramaniyamraja balasupramaniyamraja
  • 09-06-2021
  • Mathematics
contestada

8 man takes 15 days to cut a drain. How many men should be employed to complete the
work?​

Respuesta :

llbedoya
llbedoya llbedoya
  • 09-06-2021

Answer: 8 x 15 = 120

Answer Link

Otras preguntas

(haber) una vez cuatro amigos: la gata, magnolia, el pato, donaldo, el perro, azúcar (sugar), y el zorro, listo
A deep-sea exploring ship is pulling up a diver at the rate of 25 feet per minute. The diver is 200 feet below sea level. How deep was the diver 10 minutes ag
a –2 /9 = 2/3 solve using any method ?
how does the density of a large piece of aluminum compare to a small piece
How do the parts of our brains function? on hot summer days, devon relies on what brain structure to monitor his thirst and the need to drink more water?
How would you characterize the role of trade in the small states on the coast of west africa prior to 1450?
can u help me with question 37?
X/120 = 1/24 solve using multiplication property of equality
What kind of map shows states, cities, and connecting roads?
vertical shrink of the linear function equation.