kritinaapple12
kritinaapple12 kritinaapple12
  • 06-06-2021
  • Mathematics
contestada

Mr sharma can do 1/15part of piece of work in 1 day he worked for 3 days and left if Vishnu finished the remaining work how much work is done by bishnu?

Respuesta :

esthercarreras esthercarreras
  • 06-06-2021

Answer:

12/15

Step-by-step explanation:

if in one day mr sharma did 1/5 part of piece of work and he worked three days he did 3/15, if vishnu finished the remaining work then he did 12/15 parts, they did 15/15

Answer Link

Otras preguntas

Find 4 consecutive terms in an arithmetic progression (AP) whose sum of the middle two terms is 18, and the product of the two end terms is 45.
The ratio of factorial of a number x to the square of factorial of another number,which when increased by 50% gives the required number 1.25
Where are the splenic sinuses?A) Malpighian corpuscleB) TrabeculaeC) White pulpD) Red pulpE) Cords of Billroth
Based on your observations from Part I, Step #4, what inference can you make pertaining to the density of the phase of lauric acid which is on top in the test t
What is the cell body of a neuron called A) Ganglion B) Perikaryon C) Astrocyte D) Nissl E) Terminal bouton
Simple Interest If you want to earn $900.00 of simple interest at a rate of 9% in a span of 6 months, how much money must you invest? (Round your answer to two
A natural number is chosen at random from the first 100 natural numbers. What is the probability that the number chosen is a multiple of 2 or 3 or 5?A 30/100B 1
What territories did the U.S. gain as a result of the Spanish American War?
If y=22 find the value of 5y
o search Do Which is the graph of the linear inequality y < 3x + 1?​