lkobahadurkarki038
lkobahadurkarki038 lkobahadurkarki038
  • 08-05-2021
  • Mathematics
contestada

if 12 men complete a piece of work in 10 days in how many days would 15 men complete the same work​

Respuesta :

Brobertiello Brobertiello
  • 08-05-2021
12 men = (1/10) work per day

15 men = (1/8) work per day

So 8 days
Answer Link
Joshika22
Joshika22 Joshika22
  • 08-05-2021

Step-by-step explanation:

number of men =12

time taken = 10 days

time taken to complete the work by 15 men = 12÷10=1.2

= 1.2 ×15 = 18

therefore, 18 days is taken to complete the work by 15 men

Answer Link

Otras preguntas

five-eighths of the prizes at the giant spin were dolls.if there were 64 prizes, how many prizes were not dolls
Factor the equation 81x^2-16y^2
V=YNJ for Y Solve for specified variable. Y=?
Error Analysis: Pedro compares 7/33 and 2/11. He incorrectly says 7/33 < 2/11 because 4.71 < 5.50. Compare 7/33 and 2/11.
What compound composes most of the cell membrane?
In England, standard household voltage is 240 volts. If you brought your own hair dryer on a trip there, you would need a transformer to step down the voltage
2/3 = 1/2q ? Can show me the steps to do this Can anyone do this for me step by step 2/3=-1/2q
what other expression is equivalent as 8x6?
find the equilibrium point for the pair of demand and supply functions. D(p)=700-32p;S(p)=380+17p   HELP!
Is v2 = v1t+a dimensionally correct? Explain please!