malikfaizan5678900 malikfaizan5678900
  • 06-04-2021
  • Mathematics
contestada

8 men can complete the project in 24 days in how many days 12 men can complete the same project

Respuesta :

abidemiokin
abidemiokin abidemiokin
  • 11-04-2021

Answer:

16days

Step-by-step explanation:

This is an inverse proportionality

Let the number of men be m

Let the time taken in days be d

Hence m ∝ 1/d

m = k/d

If 8 men can complete the project in 24 days, then;

8 = k/24

k = 8*24

k = 192

To determine the time it will take 12 men to complete the same job, we will say;

m = k/d

12 = 192/d

d = 192/12

d = 16

Hence it will take 12men 16days to finish the same job

Answer Link

Otras preguntas

please help maths geometry
Give two examples of poverty​
you quickly need a 133-ω resistance value but only have a collection of 100-ω resistors. what can you do?
Mr. Morris borrowed $25,000 from the bank. The time of the loan was 4 years. How much will he pay if the interest rate is 5.25%? (Use simple interest.)
Which information would the nurse educator include regarding the seating of the patient?
True or false: Exploration was already underway before the Europeans decided to start exploring.
a gain from the sale of equipment would be (added/subtracted) to (from) net income, when computing cash flows from operations using the indirect method.
1. hardwoods reproduce using flowers and have broad leaves; hardwoods include trees such as blank, blank, and blank.
Four point charges lie on the vertices of a square with side length L. Two adjacent vertices have charge Q, while the other two have charge -Q. What is the magn
Daca a+b=5 si b+c=7 atunci 2a+5b+3c este...