jacobnewcomb jacobnewcomb
  • 10-03-2021
  • Mathematics
contestada

A building company completes 42 homes every 2 months.

At this rate, how many homes can the company complete in 6 months?

Respuesta :

gia23760
gia23760 gia23760
  • 10-03-2021

Answer:

126

Step-by-step explanation:

if they can do 42 houses in 2 months we need to find out how many houses they can complete in 1 month

[tex]42 / 2 = 21[/tex]

so they can build 21 houses in 1 month and we need to find out how many they can build in 6 months

[tex]21*6 = 126[/tex]

they can complete 126 homes in 6 months

Answer Link

Otras preguntas

Triangle ABC has side lengths 10, 14, and 26. Do the side lengths form a Pythagorean triple?
name five delegates to the second continental congress
From the point of view of sociology, an orthodox jewish school for girls requiring long skirts is __________ compared to the dress code of girls in most public
I need math answer please
PLEASE HELP ME!!! 3 3/5 + V + 5 2/3 = 15 A. 5 4/15 B. 5 11/15 C. 6 3/8 D. 6 11/15
What is the most frequent outcome for those found ngri? a. the defendant is sent home under house arrest. b. the defendant is hospitalized. c. the defendant is
A secret anti-foreign society in China that revolted against Europe resulted in which event? Crimean War Boxer Rebellion Nationalist Revolution Opium War
Is plastic biotic or abiotic?
Nadia made 56 muffins. She wants to fill each treat bag with 8 muffins. Nadia bought 7 bags.
What is the name of the element with a valence electron configuration of 4s^2