mustafa43
mustafa43 mustafa43
  • 06-11-2020
  • Mathematics
contestada

31. Six men can do a piece of work in 8 hours.
How long will it take four men to complete the
same work?
A. 12hrs
B. 48hrs
C. 6hrs
D. 4hrs​

Respuesta :

maeterence1234
maeterence1234 maeterence1234
  • 06-11-2020

Answer:

I think the answer is A. I hope that is right

6×8= 48

4×12=48

Answer Link

Otras preguntas

What is the volume of this rectangular prism
PLEASE HELP!!! #3 Need help ASAP
Which of these is a simple sentence? A) Gardening has many therapeutic benefits. B) We have a number of horticultural experts here to help, so don't feel intim
On a track and field team, 8% of the members run only long-distance, 32% compete only in field events, and 12% are sprinters only. Find the probability that a r
Name 5 machine principles​
The ratio of the debt to gdp is a measure of the burden the debt places on the economy. a. True b. False
How were the lives of Americans affected after the war ended
Six bonding pairs around a central atom results in a what? A. tetrahedral compound B. linear compound C. trigonal bipyramid D. octahedral
simplify completely x^2+4x-5/5x^2-8x+3
The drama class at a middle school was preparing for their spring play in the school auditorium. One week before the performance, a parent complained to the sch