Pinkbutterfly10 Pinkbutterfly10
  • 06-10-2020
  • Mathematics
contestada

A road construction crew can repair a 1/2 mile section of road each week. At this rate, how many weeks would it take to repair a road that is 25 1/2 miles long?

Respuesta :

Wickedlyrich
Wickedlyrich Wickedlyrich
  • 06-10-2020

Answer:

51 weeks

Step-by-step explanation:

Answer Link

Otras preguntas

what was the situation of The villages before the advent of British​
37. What is the slope of the equation ?-3= -x + 239. Simplify: -13 + 12 = (-4) + 2HELP! answer if you can! it's two question!​
PLEASE HELP IF IT SAYS YOUR LOG IN HAS BEEN BLOCKED ON QUOTEV, HOW LONG WILL IT TAKE FOR YOU TO BE ABLE TO LOG IN AGAIN?? ASKING FOR A GOOD FRIEND
Select the correct image, Identify the molecule that is not a compound, H H H H-Si-H N H H о 2020 Edimentum. All rights reserved.
calculate the number of moles equivalent to 5.0 gram of calcium oxide ​please help
In the diagram, ∆ABC and ∆DBE are similar. What is the scale factor of the dilation that will map the preimage ΔABC onto the image ΔDBE? A. 1.33 B. 0.75 C. 0.66
state crunchy theorem​
Lennox owns a big apple orchard. She ships her apples to various markets using a fleet of trucks. Every week, each truck goes on 3 trips, and for each trip Lenn
Complete each ordered pair so that it is a solution of the given linear equation. x - 4y = 4; (_,3), (4,_)
find the area of the figure pictured below. 3.8ft 8.3ft 7.4ft 3.9ft