abdul141097 abdul141097
  • 10-06-2020
  • Engineering
contestada

Scheduling can best be defined as the process used to determine:​

Respuesta :

racinglegend7
racinglegend7 racinglegend7
  • 10-06-2020

Answer:

Overall project duration

Explanation:

Scheduling can best be defined as the process used to determine a overall project duration.

Answer Link

Otras preguntas

What is “An Episode of War” by Stephen Crane primarily about?
discuss an example of similar, possibily confusing medical terms, and their meanings.
Classify the following triangle. Check all that apply.
cos^2a/(1-tana)+sin^3a/(sina-cosa)=sina+cosa​
The GCD(a, b) = 9, the LCM(a, b)=378. Find the least possible value of a+b
Words are slippery customers. The full meaning of a word does not appear until it is placed in its context. . . . And even then the meaning will depend upon the
What is the difference between the rough and smooth endoplasmic reticulum
Summer squash plants with the dominant allele C bear white fruit, whereas plants homozygous for the recessive allele c bear colored fruit. When the fruit is col
help me to do this question friends ​
Use a special right triangle to write sin 30° as a fraction. HELP PLEASE!!