ritahastie919 ritahastie919
  • 06-03-2020
  • Business
contestada

If the actual level of activity is 4% less than planned, then the fixed costs in the static budget should be decreased by 4% before comparing them to actual costs.

a. True
b. False

Respuesta :

ochukoorakpoghenor
ochukoorakpoghenor ochukoorakpoghenor
  • 11-03-2020

Answer: false

Explanation:

Answer Link

Otras preguntas

Martha's mom is making a party bags for all of her guests she has 24 green gumballs and 33 blue gumballs she wants to split them evenly between all the bags wit
All individuals of the same species in the same area
Photosynthesis involves the transformation of light energy into A) kinetic energy. B) chemical energy. C) mechanical energy. D) hydroelectric energy.
Inventor Buckminster Fuller introduced the geodesic dome, a many-sided structure of interlocking ___________.
535 = d +4 Whats d????????????????????? <33 thnx babes.
Break apart ones to make a ten. Then add and write the sum. 62+9=
What is internal conflict in a story?
Why was the pilgrims first corn crop such a successful one?
Which describes the importance of Valley Forge to Americans during the Revolutionary War? A. The British were not able to defeat the Americans and withdrew fr
why did the us government create the Warren commission?