a engineer has started to create a model in 27 days. 1/6 of the model is complete. how many days will it take to complete the model?

Respuesta :

kkelly69 kkelly69
  • 11-01-2020
It would take 22 1/2 days:

1/6 of 27= 4.5 days

4.5x5= 22.5
Answer Link

Otras preguntas

The sum of the fractions 1/4,2/3,3/8,5/6, and 3/4 is
which of the following structures are used by prokaryotes for attaching to surfaces? a. capsule d. nucleoid
If you push a book against a wall hard enough, it will not slide down even though gravity is pulling it.
A carpenter sands a wooden board until it is smooth. Is this a physical or a chemical change?
Sandy has $200 in her bank account. If she writes 6 checks for exactly $19.98, what expression describes the change in her bank account?
What is the sign of the product? (–12)(12)(–6.3)(–0.2)(–15.9) A. positive B. negative
Boron occurs naturally as two isotopes. What is the difference between these isotopes? a)They have different numbers of electrons and different charges. b)They
what happened to the south's economy during the civil war
is 4/10 greater than 3/8
all cells are surrounded by a cell wall true or false