undercoverlamp543 undercoverlamp543
  • 09-04-2024
  • Business
contestada

What is the first step that precedes the development of a project scope management plan in a traditional, plan-driven project?
a. Identify stakeholders
b. Create a work breakdown structure
c. Create a product backlog
d. Collect requirements

Respuesta :

Otras preguntas

please help me asap​
The midpoint of AB is M(2,-2). If the coordinates of A are (8,1), what are the coordinates of B?
WHAT IS THE AVREGE SIZE OF A MALE REPRODUCTIVE ORGAN AGE 13- 15 -20
4. Which was NOT a long term cause of the French Revolution? a. Corrupt and inconsistent leadership b. Taxes c. Prosperity d. Enlightenment
what is the median of this data set? [1,2,3,4,5,81]
If f(x) = -x^2 +5z and g (x) = 2x-4 find
Which item discibe possible solution to air pollution
What is 2+2 because this is epic
write the unit of electric charge​
What was the main aim behind Wegener's continental drift theory? A. To explain major climate changes B. To explain geological similarities C.to explain landf