  • Engineering
contestada

A civil engineer involved in construction requires 4800, 5800, and 5700 m² of sand, fine gravel, and coarse gravel, respectively, for a building project. What's the total volume of materials required in cubic meters?
A) 16300 m²
B) 16300 m³
C) 163 m²
D) 163 m³

Respuesta :

Otras preguntas

1. Why is it important to clean and sanitize the tools and utensils in cooking?2. What are the things to be considered before preparing salad and dressing?​
write a recursive formula for the sequence 3,-6,12,-24,48
How do you think King Louis XIV felt the signing of declaration independence?
Ram said to me "Dont stand up" .(into indirect speech)​
Explain the difference between a diploid and a haploid cell. can sum1 tell me the difference plzzzz
helpp! is Au an element, compound, or mixture?
please help me asap almost due Evaluate each monomial for X = 5, Y = -1, And Z = 4
what is the difference between Theravada buddhism and Mahayana buddhism?
PLEASE HELP I DONT WANT TO FAIL
I NEED CORRECT ANSWERS FOR THESE THREE QUESTIONS ASAPPP FOR 25 POINTS