The direct cost for completing an activity in the shortest time it can realistically be completed in is called its ________ cost.

a. Expedited
b. Normal
c. Accelerated
d. Crash

Respuesta :

Otras preguntas

Find the surface area of the cylinder. Use pi=3.
My sister needs help with this problem Can you post step by step Thank you!
where are they from, what type of sentence​
PLEASE HELP AND ANSWER FOR BRAINLIEST PLEASE EXPLAIN
Drag the correct labels to the table. Not all labels will be used. Identify the benefits of trade during the Hellenistic era. PLEASE THIS IS IMPORTANT
B. Use the drop-down menus to correctly identify steps in the water cycle. Label A Label B Label C Water moves from the hydrosphere to the atmosphere through Wa
For Anya's birthday her father gave out colorful birthday hats that were cone shaped. Anya was very happy that day. The opening of the bottom of the hat was 5 c
2. 10+ 2 + 3 x 5 - 3​
What’s the equation
Help again pleaseee i terribly bad at math