2034975 2034975
  • 06-01-2023
  • Mathematics
contestada

A construction company takes 1 2/3 hours to remove 6 1/2 metric tons of dirt from a construction site. What is the unit rate in metric tons per hour? Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

Otras preguntas

Choose the false statement regarding behavior at a classical concert. You should dress up as much as the performers. Applause only occurs between songs. Yelli
The mass of an object will change depending on how much gravity is pulling on it true or false
What is 612 divided by 68 please show work
Matt paid 55$ at a restaurant. the amount included a 10% tip. What was the check amount before the tip?
Donna is suffering from leg pain in which the calf muscles contract involuntarily what is she diagnosed with?
Use your knowledge of lipids to explain why desert plants need the waxy coating on their leaves to survive.
|5v-10|=0 solve for v
Behavior modification depends upon what principle?
insert parentheses in the expression 4-5+2-6-11=6
Graph y+6=4/5(x+3) using the point and slope given in the equation