tanotran1961 tanotran1961
  • 06-12-2022
  • Business
contestada

a(n) (labor/spending/volume/efficiency) variance occurs when the standard direct labor hours expected for actual production differs from the actual amount used.

Respuesta :

Otras preguntas

Simplify the expression 10-4x(6+5-1) divided by 8+7
A conversation in a story or play is called
Lin Yao looks at the back of a spoon. How should she describe her reflection?
Why can't donkeys procreate?
Evaluate. 90 • 4 – 14 ÷ 2 + 10² ÷ 5 • 2
The file manager used in Microsoft Windows is
Which type of reaction is FeS+2 HCI--> FeCI2 + H2S?
Given 16.2 grams of substance Y, if the substance absorbs 2722 joules of energy and the specific heat of the substance is 9.22 J/g·°C, what is the final tempera
The mass murder of Jews in Russia was carried out by
The mean radius of earth is 6,371.0 kilometers and the mean radius of earths moon is 1,737.5 kilometers. What is the approximate difference in the mean conferen